Energy efficiency measures in Riga, 3 Hipokrāta iela

Project/agreement No.
4.2.1.2/17/I/027
Project funding
936 363.64 EUR, ERDF funding EUR 795.909.09, state budget funding EUR 140.454.55
Project manager
Project realization
31.05.2018. - 30.05.2019.

Aim

The aim of the project is to promote energy efficiency improvement in the Rīga Stradiņš University student hostel at 3 Hipokrāta iela in Riga.

Description

Main activity groups

  • Establishment and maintenance of the construction site
  • Deconstruction works
  • Roof and façade reconstruction, including infilling
  • Landscaping and lightning protection measures

The project will result in an energy consumption of 80.48 kWh/m2/year and carbon dioxide emissions of 15.56 kg CO2/m2/year.

The currently estimated CO2 savings are 73.678 tonnes, while the primary energy savings are 35.95 kWh/m2.

Progress to date (30.06.2018)
  1. All finishing materials on site have been coordinated
  2. Window assembly has been coordinated
  3. Entrance door assembly has been precisely defined
  4. Emergency exit door assembly has been adjusted
  5. Finishing under external sill has been precisely defined
  6. Façade paint attachment has been precisely defined
  7. Installation of windows is in progress
  8. Work continues on the installation of the façade’s thermal insulation wool
  9. All thermal insulation wool for the façade and most of the windows have been delivered to the site

Progress to date (31.07.2018)
  1. Roof construction continues
  2. Work on the first stage has been partially completed and the scaffolding and hoists are being moved to the second stage
  3. Installation of the window displays is in progress
  4. Insulation of the basement floor is in progress
  5. Insulation of the technical floor of the attic is in progress

Based on the progress of completed works per month, about 44% of the total estimated works have been completed.

 

Progress to date (31.08.2018)
  1. Roof construction continues
  2. Installation of the window displays is in progress (12 pcs. remaining)
  3. Insulation of the basement floor completed (final works)
  4. Insulation of the technical floor of the attic is in progress (50% of the total work completed)

Based on the progress of completed works per month, around 64% of the total estimated works have now been completed.

9.jpg (673×1384)

Progress to date (30.09.2018)
  1. Repairs of the second entrance staircase is being coordinated
  2. Finishing of the window displays is in progress
  3. Parapet and roof construction works in progress
  4. Façade construction works in progress
  5. Basement works in progress

Based on the progress of completed works per month, around 80% of the total estimated works have now been completed.

Progress to date (31.10.2018)
  1. Restoration of stairs and railings
  2. Construction of the façade and the entrance assembly
  3. Roof parapet insulation, roof melting, handrail installation
  4. Finishing works of the façade and construction of the curb                                        
  5. Construction of the earthing circuit
  6. Finishing works for roof construction

4.jpg
5.jpg
6.jpg
7.jpg

9.jpg
10.jpg
11.jpg

Progress to date (līdz 30.11.2018)
  1. Construction of entrance assemblies
  2. Insulation works of the basement                                  
  3. Roofing and parapet renovation
  4. Construction of the curb and the coating of the entrance assemblies       
  5. Finishing works for façade construction
  6. Finishing works for façade construction

10_0.jpg
1_0.jpg
2_1.jpg
3_1.jpg
4_1.jpg
5_1.jpg
6_1.jpg
7_1.jpg
8_1.jpg
9_0.jpg

Progress to date (13.12.2018)

The building was commissioned on 13 December 2018.

Dokumenti

1.jpg (109.91 KB)
2.jpg (76.17 KB)
3.jpg (132.94 KB)
4.jpg (149.17 KB)
5.jpg (252.57 KB)
6.jpg (124.03 KB)
7.jpg (322.38 KB)
8.jpg (347.55 KB)
9.jpg (316.86 KB)
10.jpg (249.95 KB)
11.jpg (127.96 KB)
12.jpg (154.86 KB)
13.jpg (261.22 KB)
14.jpg (256.1 KB)
15.jpg (386.82 KB)
16.jpg (348.92 KB)
17.jpg (274.24 KB)
18.jpg (314.7 KB)
19.jpg (297.75 KB)
20.jpg (396.82 KB)
21.jpg (273.19 KB)
22.jpg (222.32 KB)
23.jpg (333.65 KB)
1.jpg (74.33 KB)
2.jpg (48.93 KB)
3.jpg (97.36 KB)
4.jpg (61.89 KB)
5.jpg (37.55 KB)
6.jpg (71.11 KB)
7.jpg (85.05 KB)
8.jpg (70.03 KB)
9.jpg (56.94 KB)
10.jpg (77.13 KB)
11.jpg (61.03 KB)